(254-2) 3749327 . 3740590 . 3748889. Email: info@orientalconstructionkenya.com
Kenya Projects
Tanzania Projects
Rwanda Projects
uganda
 
2009-02-23
News4...
 
2009-10-15
News3...
 
2009-10-25
News2...
... >>Rift Valley Project I and IV

Rift Valley Water Supply and Sanitation Project – Nakuru Works Contract No. RVWSB/WC/01/1 and Contract No. RVWSB/WC/01/4 - Kenya
Construction of :-

  1. Borehole manifold ferrous pipeline, length 5600M, diameters varying from 200mm to 400mm.
  2. Reinforced concrete collector tank, capacity 500M3, Pump House, Chlorination Building, Office,s, Generator House and 4 Nos. Staff Houses.
  3. Bulk transfer Pumping main, 450mm diameter steel pipeline, length 4,640 metres.
  4. Bahati reinforced concrete reservoir, capacity 2500M3 .
  5. Bulk transfer gravity main to Mereroni Treatment Works, 400mm and 450mm diameter steel pipeline,length 16520 metres.
  6. Electrical works.
  7. Installation of 8 Nos. Bulk zonal water metres, diameter varying from 80mm to 350mm.
  8. Installation of 15800 Domestic water ,metres.
  9. Rehabilitation of Mereroni Raw Water Main, length 19,400 metres, diameter 250mm.
  10. Rehabilitation of Mereroni Water Treatment Works.
  11. Replacement of control panels.
  12. 400mm diameter Steel Transmission Pipelines from Kabatini and Baharini Borehole to Mereroni Treatment Works -  11,900 metres long.

Client ................................ Rift Valley Water Services Board
Consulting Engineers......... H. P. Gauff
Value of Works................ KShs. 504,334,399.32 for Contract  No. RVWSB/WC/01/1
Year of Completion.......... 2008
Value of Works................ KShs. 164, 992,458.95 for Contract  No. RVWSB/WC/01/4
Year of Completion.......... 2009



Water Treatment
 
Water Treatment
Water Treatment Plant of 12,600M3/day capacity con...


>> More Details


uPVC Distribution Mains
 
uPVC Distribution Mains
uPVC Distribution Mains 100mm to 200 mm depth, 21,...


>> More Details


Storage Reservoir
 
Storage Reservoir
1 No. paved drive way and drains -2000M3 capacity ...


>> More Details

 
   
 
Home | About us | References | Plant & Machinery| All Projects | Contact us | Staff Mail
All Rights Reserved © 2010. Accident and Risk Prevention Policy